scheduled downtime meaning in English
计划停工时间
计划休风时间
Examples
- Triggered downtime allows you to define downtime that should start at the same time another downtime starts ( very useful for scheduling downtime for child hosts when the parent host is scheduled for flexible downtime )
停机触发允许您定义在停机的同时停止另一个(这对于主机计划停机的同时停止其子机是十分有用的) 。